Introduction to toy EN71 certification
EN71 is the standard of toy products in EU market. Many countries have established their own safety regulations for these products. Manufacturing companies must ensure that their products meet relevant standards before they are sold in the region. The manufacturer must be responsible for accidents caused by production defects, poor design or improper use of materials. Therefore, the toy EN71 certification act was introduced in Europe. Its significance is to regulate the toy products entering the European market through EN71 standard, so as to reduce or avoid the harm of toys to children.
EN71 Authentication Identification
EN71 Authentication Test Range
The toy instruction applies to any product or material designed for or scheduled to be played by children under 14 years of age.
Mechanical and physical properties; Combustion properties; Transfer of certain elements; Chemical-related experimental devices; Non-experimental chemical toys; Illustration of age warning signs; Finger paints: Colorants, preservatives, migration of specific elements, primary aromatic amines, olfactory and taste tests, pH values, product information including agents, additions Organic chemical compounds: flame retardants, sweat fastness, colorants, primary aromatic amines, monomer migration, solvent migration, solvent inhalation, wood preservatives, non-wood preservatives, plasticizers, toxicity assessment, pH value, formaldehyde.
In addition, for electric toys, including battery-driven toys and toys with AC/DC converter power supply. In addition to the toy general standard EN71 test, electromagnetic compatibility test is also carried out, including: EMI (electromagnetic radiation) and EMS (electromagnetic immunity).
EN71 certification process
1. Submitting applications;
2. Submitting samples;
3. Signing a contract;
4. Prepaid down payment;
5. Arrange orders;
6. Testing;
7. Issue certificates and reports;
8. Pay the final payment and receive the report.
EN71 Certification Factory Inspection
No factory inspection is required.
EN71 certification cycle
Five working days